Workshop 1
Compost Use In Green Infrastructure
Design, Installation, Maintenance, Performance and Economics |
|
Workshop 2
Business Of Anaerobic Digestion
Financing, Siting, Biogas Markets, Project Evaluation |
Instructors:
– Henry Stevens, City of Portland Bureau of Environmental Services
– Shanti Colwell and David McDonald, Seattle Public Utilities
12:00 PM - 6:00 PM
Agenda
| 12:00 PM - 12:15 PM |
|
Workshop Overview, Introductions |
| |
|
|
|
| 12:15 PM - 1:15 PM |
|
Specifications for Compost-Amended Soils and Bioretention |
| • Why use compost? |
| • Critical elements of compost for these applications — particle size, quality and need for consistent product |
| • Soil Mixes |
| |
Compost-amended (native soil considerations, compost application rates) |
| |
Bioretention: Mineral aggregate, compost/aggregate ratios, variations in specifications |
| |
Where to use compost-amended, where to use bioretention (pros/cons) |
| • Native soil considerations |
| |
Nutrients |
| |
Geotechnical feasibility |
| • Pollutant removal |
| • Nutrients in compost |
| |
| 1:15 PM - 2:15 PM |
|
Installation and Maintenance |
| • Compost-amended soils |
| |
Critical elements for installation |
| |
Lessons learned |
| • Bioretention soils |
| |
Critical elements for installation |
| |
Lessons learned |
| • Vegetation establishment and system stabilization |
| • Maintenance requirements (aesthetic and functional), frequency, staffing |
| • Evolving plant palette to reduce O&M demand |
| • Maintenance costs and budget allocation |
| |
| 2:15 PM - 3:00 PM |
|
Monitoring, Performance and Cost-Benefit Analysis |
| • Predictability and reproducibility to guarantee performance of installations |
| • Modeling storm water flow on compost-amended soils |
| • Lifecycle costs, monetizing benefits of "green" vs. "grey" (conventional) |
| • Becoming standard practice in storm water management |
| |
| 3:00 PM - 3:15 PM |
|
Q&A, Overview of Installations on Tour |
| |
|
|
|
| 3:15 PM - 3:30 PM |
|
Break and Board Bus |
| |
|
|
|
| 3:45 PM - 5:45 PM |
|
Tour of Installations |
| |
|
|
|
| 6:00 PM |
|
Return to Red Lion |
|
|
The American Biogas Council presents this workshop on the business of anaerobic digestion.
Instructors:
– Dean Foor, Project Engineer, Essential Consulting Oregon
– Rolfe Philip, VP Business Development, Yield Energy
– Mike Casper, Director of Project Development, Homeland Biogas Energy
– Adam Halsband, Business Development Manager, Eisenmann Corporation
– Additional Instructors Invited
9:30 AM - 4:30 PM
Agenda
| |
|
Organic Waste Management: Food and Agricultural Feedstocks |
| • Sourcing and receiving feedstocks |
| • Treating and preprocessing |
| • Options for contaminant removal |
| • Benefits and challenges |
| |
| |
|
Determining a Location |
| • Brownfield/old landfill site |
| • Composting site |
| • Greenfield |
| • Co-locate at a dairy |
| • Food processing plant |
| • Proximity to off-takers/power grid |
| • Wastewater treatment facility |
| |
| |
|
Types of Digester Technology |
| • Wet system configurations |
| • Dry fermentation |
| • Plug-flow and complete mix |
| • Evaluating and selecting vendors |
| • Ancillary facilities |
| |
| |
Running a Financial Model, Project Financing |
| • ROI requirements |
| • Determining tip fee, digestate value |
| • Acquiring Financing (debt vs equity) |
| • AD friendly lenders |
| |
| |
How Do You Want To Execute The Project? |
| • EPC (Engineering, Procurement, Construction) firm |
| • Engineering company and bid out packages |
| • Does your lender require an EPC wrap contract? Or are you self-financed? |
| • Who will ultimately be operating the facility? In-house staff? Third party? Need for a system safety and operability review before design is complete |
| • How to minimize operating costs |
| |
| |
Regulations And Permitting |
| • Air, water and solid waste permits |
| • Land use and zoning considerations |
| • State codigestion rules |
| |
| |
Negotiating Off-Take Agreements |
| A. Managing Digestate |
| |
• Animal bedding |
| |
• Compost |
| |
• Liquid fraction - land application |
| |
• Drying |
| |
• Innovation - Biochar, membrane separation, ammonia stripping and fertilizer recovery |
| |
|
| B. Determining Best Use Of Biogas |
| |
• Turbines, engines and CHP |
| |
• Renewable natural gas grid injection |
| |
• Vehicle fuel opportunities |
| |
• Utilization of fuel cells |
| |
|
| C. Negotiating a Power Purchase Agreement |
| |
• Price of power |
| |
• Escalation clauses |
|